Athens Metro, Larissis Subway Station

Athens Metro, Larissis Subway Station

Project:

Reconstruction of 1.20 m wide sections of a reinforced concrete floor that had to be demolished due to changes in the construction plans

System:DYWIDAG 25 mm and 16 mm Ø extruded couplers

Application:Connection to the existing reinforcing steel

Special Features:High production efficiency (30 to 35 splices per hour); non slip connection which allowed a reliable reconstruction of the demolished floor with the same load-bearing capacity

Construction Period:February - March 1997

Owner

Attiko Metro SA

Structural Design

Attiko Metro SA

General Contractor

Joint venture of Olympiako Metro


DSI Services

Supply of 5,000 DYWIDAG extruded couplers, technical assistance and supervision

Back More Projects
DYWIDAG-Systems International GmbH

use our contact form
send us an e-mail
or call us:
+49-5731-76 78-0